What is OEE? Overall equipment effectiveness and how to calculate it
OEE shows, as a single percentage, how much of what a machine could produce in the planned time it actually produced as good parts. We explain the formula, a worked table and where to collect the data.
What is OEE (Overall Equipment Effectiveness)?
OEE (Overall Equipment Effectiveness) evaluates the efficiency of a machine or line by measuring three losses together: did the machine stop, did it slow down while running, and how much of what it produced was good?
Saying "the machine ran all day" tells you nothing on its own. OEE lets you compare different machines, shifts and periods with the same measure and see where improvement should start. An OEE of 100 percent means production over the entire planned time, at ideal speed, without any scrap.
The three components of OEE
Availability
Run time ÷ planned production time. Breakdowns, mould / setup changes and waiting for material reduce it.
Performance
(Units produced × ideal cycle time) ÷ run time. Minor stops and reduced speed reduce it.
Quality
Good units ÷ units produced. Scrap and rework reduce it.
OEE = Availability × Performance × Quality
Multiplying the three ratios gives the same result as this shortcut:
OEE = (good units × ideal cycle time) ÷ planned production time
Planned breaks and time with no production planned are subtracted from planned production time; OEE evaluates only the time in which production was planned.
Example: one shift on a CNC machine
The shift is 480 minutes, with 45 minutes of planned breaks and meetings. During the shift there were 25 minutes of breakdowns and 35 minutes of setup / tool changes. The ideal cycle time of the part is 1.2 minutes. 280 parts were produced in the shift, 14 of which were scrapped.
| Feature | Calculation | Result |
|---|---|---|
| Planned production time | 480 − 45 | 435 min |
| Unplanned downtime | 25 breakdown + 35 setup | 60 min |
| Run time | 435 − 60 | 375 min |
| Availability | 375 ÷ 435 | 86.2% |
| Performance | (280 × 1.2) ÷ 375 = 336 ÷ 375 | 89.6% |
| Quality | (280 − 14) ÷ 280 = 266 ÷ 280 | 95.0% |
| OEE | 0.862 × 0.896 × 0.950 | 73.4% |
| Check (shortcut) | (266 × 1.2) ÷ 435 = 319.2 ÷ 435 | 73.4% |
How to read the result
In this shift the machine produced roughly three quarters of the good parts it could have produced. The largest loss is in availability (13.8%): 35 of the 60 minutes of downtime come from setup and tool changes. Starting improvement by shortening setup time gives faster results than focusing on scrap.
The six big losses that reduce OEE
- Breakdowns — unplanned machine stops (availability)
- Setup, mould and tool changes (availability)
- Minor stops — jams, sensors, short waits (performance)
- Reduced speed — running above the ideal cycle time (performance)
- Startup scrap — the first parts after setup (quality)
- Production scrap and rework (quality)
Where does the data needed for OEE come from?
EPROX ERP does not include a ready-made, out-of-the-box OEE dashboard. The data needed to calculate OEE, however, is collected within production, at the source:
- KEOS workstation terminal: operation start and finish times are recorded automatically; output, scrap and downtime are entered against the job
- Scrap reasons are linked to the operation and the terminal
- Field Gateway: counters and process values are read from PLCs and counters that support Modbus TCP (read-only)
- Time per unit in the BOM routing can be used as the reference for ideal cycle time
- Reports, formulas and dashboards showing OEE are set up for your company with the design module
We plan this setup with an Eprom consultant according to how your machines can be connected and your shift pattern. For details, see the KEOS and Shop Floor page.
First steps to raise OEE
- 01
Measure correctly first
Record downtime immediately with its reason, and take counts from the machine or the terminal; a form filled in from memory at the end of the shift makes OEE look higher than it is.
- 02
Start with the biggest loss
Improvement starts with whichever of the three components is lowest.
- 03
Shorten setup time
Doing preparation while the machine is running (the SMED approach) is often the fastest gain.
- 04
Plan preventive maintenance
Periodic maintenance done before breakdowns reduces unplanned downtime.
- 05
Track scrap with its reasons
If the same reason keeps recurring, there is a lasting problem in the process.
Related guides and pages
KEOS and Field Gateway
Touchscreen workstation terminal and machine data over Modbus TCP.
Learn moreQuality and Maintenance
Inspection plans, quarantine, scrap reasons, periodic maintenance.
View moduleWhat Is MRP?
Gross and net requirements, minimum stock and scrap; a step-by-step calculation with a cabinet example.
Read the guideProduction Planning Software
Planned production from order to work order, from workstation load to what actually happens in the workshop.
Learn moreFrequently asked questions about OEE
What is a good OEE value?
It varies by industry, machine and product mix. 85 percent is a frequently cited reference in the literature; what really matters is measuring your own starting value and improving it over time.
Are planned breaks included in OEE?
No. Planned breaks and time with no production planned are subtracted from planned production time.
Where does the ideal cycle time come from?
It is the shortest sound cycle time the machine can reach for that part; the manufacturer's value, mould / program data or the shortest cycle time actually measured can be used. If the value is unrealistic, the performance ratio can exceed 100 percent; this is a sign of a data error.
Does EPROX ERP have a ready-made OEE dashboard?
No. EPROX ERP collects the output, scrap and downtime data needed for OEE from KEOS terminals and machine counters from the Field Gateway. Reports and dashboards showing OEE are set up for your company with the design module.
Let's talk about downtime and scrap data in your workshop
Let's plan together which data should be collected and how, based on the state of your machines and workstations.
- 30–45 minute online or on-site demo
- Sample setup for your industry
- Using your own bills of materials and orders
- No obligation to buy