Production planning software: planned production from order to work order
EPROX ERP brings orders, bills of materials, stock and the workshop together in the same database. What is to be made, which material is missing and where each job stands at the workstations are visible on one screen.
- Multi-level BOMs and routings
- MRP suggestion: Make / Buy
- Live data from the workshop with KEOS
What does production planning software do?
Production planning is deciding what, how much, at which workstation and in which order to produce. For the decision to be right, three pieces of information must be current at the same time: customer orders, product bills of materials (materials and operations) and stock.
In many factories this information sits in different files: orders in sales' spreadsheet, bills of materials in engineering, stock in the warehouse and the state of the workshop in the foreman's notebook. The plan is out of date as soon as it is made; material shortages are noticed after production has started.
Production planning software gathers this information in one place, calculates requirements and keeps the plan current with feedback from the workshop. In EPROX ERP, planning is not a separate program but the Production Planning and MRP module, which uses the same database as sales, stock, purchasing and the workshop.
The building blocks of planning
BOMs and routings
Multi-level bills of materials, scrap rate per line; sequence, workstation, operation, setup time and time per unit in the routing.
Material requirements plan
Open orders, minimum stock, available stock, open purchases and open production are calculated together; the suggestion is Make or Buy.
AyrıntılarWork orders
Numbers like IE-2026-00015; Planned → Released → In Production → Completed. Transitions are validated on the server.
Workstation load
Orders to release, workstation queues and load on the planning dashboard; the daily capacity of each workstation is defined.
Feedback from the workshop
Operations start, pause and finish at the workstation; output, scrap and downtime are entered against the job on the KEOS terminal.
AyrıntılarActual cost
Planned and actual raw material + labour cost; variance percentage when the order is completed.
AyrıntılarThe planning flow step by step
The steps an order goes through from planning to shipment; each step moves forward on the same record.
- 1
The order is confirmed
The lines and delivery date of the sales order enter the planning agenda.
- 2
MRP is run
The bill of materials is exploded; stock on hand, open purchases and open production are deducted to find the net requirement line by line.
- 3
Orders and requests are created
Work orders are created for finished and semi-finished products to be made, and a single draft purchase request for materials to be bought.
- 4
The order is released
The planner releases an order whose materials are ready; the bill of materials and warehouses can no longer be changed, and operations go to the workstation queues.
- 5
Production in the workshop
The operator starts the job on the KEOS terminal; output and scrap are reported. When the first operation starts, the order becomes "In Production".
- 6
Completion
When the last operation finishes, the order is completed; raw materials (including scrap) are consumed from stock, the finished product enters stock and the cost is finalised.
The screen the planner checks every morning
With the production module, the setup wizard installs ready-made Production Planning and Plant Manager dashboards. The dashboards are role-based and can be changed without code.
- Orders to release
- Workstation queues and load
- Late orders and open orders
- Active workstations and operations
- Weekly / monthly output and scrap by workstation
The plan does not stay on paper; it comes back from the workshop
For the plan to stay realistic, the state of the workshop has to be known immediately. At the KEOS terminal on the workstation, the operator starts, pauses and finishes the job; start and finish times are recorded automatically. When the operator switches to an urgent job, the current job is put on hold and later continues where it left off. If the network connection drops, the terminal keeps working; transactions are sent in order, without duplicates, once the connection is back.
- Waiting → Running ⇄ Paused → Completed
- Switch to urgent jobs and hand-over
- Output / scrap / downtime counters
- Offline operation
Go deeper into the topic
What Is MRP?
Gross and net requirements, minimum stock and scrap; a step-by-step calculation with a cabinet example.
Read the guideWhat Is OEE?
Availability × Performance × Quality; a calculation table with a CNC machine example.
Read the guideManufacturing ERP
Every link of production from sales to shipment in the same database.
Learn moreProduction Planning and MRP
Bills of materials, routings, work orders and material requirements plan.
View moduleFrequently asked questions about production planning software
What is the difference between production planning software and ERP?
Planning software focuses on when and where production takes place; ERP also covers sales, purchasing, stock, quality and costing. In EPROX ERP, planning is a module of the ERP; you do not need to move data between separate programs.
Does it schedule automatically against finite capacity?
Not today. The daily capacity of the workstations is defined, and load and queues are shown on the planning dashboard; the sequence and release of orders is the planner's decision.
We produce both to order and to stock; is it suitable?
Yes. MRP takes into account both the remaining open order quantities and the minimum stock level defined on items; the quantity to make for stock is suggested so as to bring stock up to the minimum.
Can the planner change the suggested quantity?
Yes. MRP suggestions come pre-selected and the quantity can be edited; only the selected ones become work orders or purchase requests. Creating orders and requests requires permission on the relevant screen.
Can we transfer our existing bills of materials and orders?
Yes. Stock items, bills of materials, open orders and opening stock are transferred during the migration; an Eprom consultant plans the transfer together with you.
See your planning with your own orders
We take one of your orders and bills of materials as an example and show you the flow together, from the MRP suggestion to the work order and the workshop.
- 30–45 minute online or on-site demo
- Sample setup for your industry
- Using your own bills of materials and orders
- No obligation to buy
If you prefer not to fill in the form, call us on +90 212 728 01 03 or message us on WhatsApp.
Demo request
Fields marked with an asterisk are required.